I am a Graduate in Civil Engineering Technology and having excellent professional experience in Supervision and Inspection of site works assuring quality of works for high-rise residential and commercial projects. I am experienced in the preparation of daily works schedules, arrangements of resources such as men, materials, etc., coordination with sub-contractors for a smooth flow of works. Also I got a good exposure in Quantity Surveying such as quantity take offs, evaluation of payment certificates, evaluation and preparation of claims on variation orders and extension of time, etc. My experience includes coordinating with architects, consultants, contractors and sub-contractors and other specialized consultants for finalizing site works related issues.
Report to the Sr. Resident Engineer.
Responsible for studying the site plan, layout, design, etc.
Assist in making any changes to the construction design to make the project more feasible.
Assist in checking the quality standards of the project and ensure that none of the environment regulations are violated.
Assist in negotiating with the contractors, raw material vendors, etc.
Responsible for effective maintenance of the project both preventive and corrective.
Assist in making the blueprints of the project using Auto-Cad.
Assist in project planning, implementation, and supervision.
Preparation of BOQ.
Prepared SORs.
Issuing NCR against defect works and their follow up.
Monitor progress of works to ensure conformance with the approved drawings, quality control procedures, performance requirements & project specifications, and the timely completion of the project.
Monitor the cost and use of company resources.
Effective Material quality check as per work standards.
Checked the detailed survey and Lay-out of structures before the execution of construction activities.
Cultivate solid ties with Contractors/Sub-contractors and clients.
Supervising staff.
Tasked to supervise and monitor the construction of Main Infrastructure Development &Network Systems; including Whole society Sewer system, HT & LT ducting, Water supply, Overhead water tank, Storm water Drainage, Power Supply sub-stations, Perimeter Fence and other Civil work & Infrastructure facilities.
Initiate action and responses to request for inspections (RFIs) and field adjustments.
Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
Prepare variation / change orders; including Scope of Works, Bill of Quantities and drawings of additional works or proposed changes.
Review design / shop drawings, material submittals and other technical submittals.
Gathered blueprints, documents and relevant materials for project cost estimations.
Preparation of Bar Bending schedule, sub-contractor bills.
Planning and execution of works as per design & drawing.
Execute steel as per approved structural design.
Calculated cost for labour, time and material requirements.
Carefully reviewed scope of projects and other factors that influenced cost.
Checking the Quality of concrete strengths regarding the grade, 7 days and 28 days test.
Checking the Quality of steel, sleeves as per structural requirement, diameter, shape etc.
Prepared all-inclusive estimate packages for review by project heads, department heads and clients.
Preparation of BOQ.
Conducted meetings to discuss factors that impacted estimations.
Checking the quality of RCC works such as foundations, columns, beams, walls and slabs etc.
Managed maintenance of cost database, entering and updating data.
Liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress.
Resolving any unexpected technical difficulties and other problems that may arise.
To verify and measure the quantity and quality of material.
To ensure IFC drawings prior proceeding works.
Inspection of activities and maintain proper record.
To inspect the work of labor as per approved IFC drawings.
Timely arrangements of the materials, Manpower & equipment needed for the work.
Planned the work and efficiently organized the plant and site facilities in order to meet agreed deadlines.